Monoliet Climbing Hall – Roeselare
Two weeks ago, we shared the start of the installation of the timber load-bearing structure. Today, we can say it: the entire timber frame is now in place.
Step by step, the structure has been assembled and the contours of the climbing hall are really starting to take shape. The combination of glulam timber and steel creates a structure that is not only technically challenging, but also makes a strong visual statement.
From engineering to production and installation: it is great to see how the design is translated into an impressive timber structure on site.
An important milestone, but not the final result just yet. The finishing works of the hall can now continue in full swing.
We are looking forward to seeing the finished result. Once the hall is fully completed, we’ll be back with one final update.